- Home
- >
- Products
- >
- V-Process Coating
- >
V-Process Coating
Preventing sand adhesion: In V-Process casting, the mold is prone to sand adhesion under vacuum. The coating isolates the molten metal from the sand. Using aggregates with high refractoriness and improving dry strength and wear resistance helps prevent sand adhesion and enhance casting surface quality.
Maintaining pressure difference: After the film burns out, the mold and cavity are likely to deform or collapse due to equal pressure. V-Process coating maintains the pressure difference between the mold and the cavity. Increasing coating thickness and density improves mold stability.
Preventing sand washing: Sand may be washed into the mold by molten metal during pouring. Enhancing the coating's high-temperature adhesion and ensuring full drying can prevent sand washing.
Aiding gas emission: Gas is generated from various factors during production. Appropriately improving coating permeability allows gas to escape the cavity through the coating, reducing defects such as gas trapping and blowholes.
- Information
V-Process Coating
Features:
lt is of outstanding recipe, excellent adhesion and adhesive strength to the plastic film.
The coating layer is of good permeability, high strength, high refractoriness and excellent sand-burn resistance performance which leads to good surface finish.
| Type | Refractory | Density | Baume | Color | Application Field | Coating Method |
| ATV-55V | Graphite powder | 1.40-1.70 | 70-80 | Red | lron casting | Spraying |
| ATV-50V | Zircon powder | 1.95-2.25 | 90-110 | White | Steel casting | Spraying |
Application guide:
1. The coating shall be stirred sufficiently with a stiring equipment and then added with alcohol and stirred again to obtain homogeneity and desired range of baume degree;
2. Coating thickness is determined according to casting weight, wall thickness and other conditions.
Storage and Shelf Life:
Keep in a cool and ventilated place away from fire and heat, Shelf life is 6 months under normal conditions.
Packaging:
25-40 kg plastic pails.
Why are our Prices more Competitive?
Direct from the factory – Thanks to our factory’s strong production capabilities, Xinda is able to eliminate middlemen and avoid unnecessary markups. This allows us to maintain steady purchasing volumes, secure better pricing, and ensure a stable, reliable supply. Long-term partnership focus – We prioritize building long-term relationships with our customers. That’s why we’re willing to operate on lower profit margins while maintaining high product quality, passing more value on to our clients.
Can we Place Customized Order?
Yes, we already own thousands of customized filters models in multiple sizes and shapes. And we are capable of new type customized production.
How Can We Handle it if there’s Quality Problem aAter Payment?
We are willing to provide technical support with professional team during and after delivery.
How Can We Make Sure About the Quality After We Put the Order?
We will implement raw material tests before production and the product quality inspection reports by high precision instruments will be sent to you before deliver.
How Long is your Delivery Time?
Our production cycle is 7-10 days in general, 5-7 days in emergency. There are also available urgent transportation method for your choice.